Infrastructure
Optical Fiber Cable Deployment
OFC route planning, deployment support, splicing and OTDR testing for reliable fiber networks.
OTDR test · livePass rate %
- Route survey100
- Splicing97
- OTDR95
- Acceptance92
AI insight · Splice loss at joint 14 measures 0.32 dB, above the 0.1 dB target. Re-splice recommended.
Route 7 · 18.4 km · 46 splices
What we cover
Fiber done right, first time.
From survey to acceptance, with test results for every link.
Route planning
Surveys, permits and optimal cable paths.
Deployment support
Supervision of trenching, ducting and aerial installation.
Splicing
Fusion splicing with loss measured on every joint.
OTDR testing
Trace analysis for loss, reflections and faults.
Link acceptance
End-to-end power and loss budget verification.
Documentation
As-built records and test reports.
AI-assisted analysis
Faults found in the trace.
AI-assisted OTDR analysis flags bends, bad splices and connector issues across hundreds of traces, so crews fix faults faster.
How it works
Survey to acceptance.
- 01 · Survey
Route, permits and design.
- 02 · Deploy
Installation and supervision.
- 03 · Splice & test
Splicing and OTDR on every link.
- 04 · Accept
Acceptance tests and as-built documentation.
Related services
Build a fiber network that performs.
Share your routes and timeline. We will propose a deployment and test plan.